Back to Top

021-26760919

Info@tarahanpey.com

Design and implementation of the residential project sustainability


Date Begin:
2018/04/28
Date End:
2018/04/28
Status:
Done

 

Private
In this project, due to the high sensitivity of the structure and the excavation done, the operation is executed on the scaffold and is carried out by the machine mast.
The reason for using a drill rig instead of a Russell driller is the speed and strength of this rig as compared to Russell, which is typically used for drilling on a scaffold.