Design of the Pasargad Project Drainage System


Date Begin:
2018/04/28
Date End:
2018/04/28
Status:
Done

 

Private
Design of the Pasargad Project Drainage System
 Gud Suspension: In this project, due to the high soil adhesion to the depth of 18 m, without designing and using a proper gut stabilization system, the excavation was carried out in accordance with the changes in the drawings and the necessity to continue excavation to a depth of 30 meters from the consultant for designing. And presenting operational plans to stabilize the well walls to a depth of 30 meters by combining various methods of stabilizing the well, such as nailing, anchor, candle and bromine, in accordance with the current status of the sustainability project, has been invited to collaborate.
In this project, the sustainability of drainage to design, taking into account the existing conditions and actual parameters of the soil, attempts to combine the existing methods with the advanced finite element software with the optimal drain stabilization scheme.