District 6 Municipality,
This project involves conducting concrete and concrete structures tests in the 5-storey office building in Saeed Park. To do this, to drill manual boreholes to obtain soil samples and complete soil tests and determine soil bearing capacity, cuttings from different beams and columns, hammer test Schmidt, sampling of rebars and carrying out tensile tests, identification of the arrangement of rebar crosses in columns and beams for structural analysis with existing conditions and carrying out retrofitting operations.